Close Menu
    What's Hot

    Himel Looks to Empower Africa’s Economy Through Sustainable Power and Better Living

    April 27, 2026

    SOUEAST Makes Debut at Auto China 2026,Co-building the Global “Travel+” Ecosystem

    April 26, 2026

    The Building & Furniture Category Highlights Sustainable and Human‑Centric Design at the 139th Canton Fair

    April 26, 2026
    Facebook X (Twitter) Instagram
    Giza DailyGiza Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Giza DailyGiza Daily
    Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email VKontakte Telegram WhatsApp

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email VKontakte WhatsApp
    Previous ArticleHisense Devotes to Bring Consumers with Immersive Experience through Innovative TV Products
    Next Article HUAWEI Themes and Mahmood Al Abadi Unravel the Majestic World of the Arabic Heritage

    Related Posts

    Himel Looks to Empower Africa’s Economy Through Sustainable Power and Better Living

    April 27, 2026

    SOUEAST Makes Debut at Auto China 2026,Co-building the Global “Travel+” Ecosystem

    April 26, 2026

    The Building & Furniture Category Highlights Sustainable and Human‑Centric Design at the 139th Canton Fair

    April 26, 2026
    Editor's Pick

    UAE mediation helps Russia and Ukraine swap 386 captives

    April 25, 2026

    Bilateral ties and regional security reviewed in UAE Dutch talks

    April 24, 2026

    Syria gets US$225 million World Bank water health aid

    April 24, 2026

    Dnata invests A$32 million in Western Sydney cargo hub

    April 23, 2026

    UAE President and Italy defence chief discuss security

    April 23, 2026

    Africa moves higher on Austria trade and security agenda

    April 22, 2026

    UAE and Sierra Leone presidents discuss bilateral ties

    April 22, 2026
    © 2026 Giza Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.