Close Menu
    What's Hot

    Inovance Invests $280M in High-Power Motor Facility, Targeting Net-Zero Heavy Industry

    April 23, 2026

    Getac Redefines Rugged Mobility with Launch of G140 Copilot+ PC, Powered by AMD Technology

    April 23, 2026

    Heidi Launches in South Africa as Clinician-Led Adoption Surges Past 15,000

    April 23, 2026
    Facebook X (Twitter) Instagram
    Giza DailyGiza Daily
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Giza DailyGiza Daily
    Home » HiTHIUM’s Breakthrough ∞Cell 1175Ah Powers Landmark 4GWh Long-Duration Energy Storage Project in Saudi Arabia
    PR Newswire

    HiTHIUM’s Breakthrough ∞Cell 1175Ah Powers Landmark 4GWh Long-Duration Energy Storage Project in Saudi Arabia

    August 27, 2025
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email VKontakte Telegram WhatsApp

    RIYADH, Saudi Arabia, Aug. 27, 2025 /PRNewswire/ — HiTHIUM, a leading global manufacturer of energy storage solutions, has been awarded a major contract by Saudi Electricity Company (SEC) to deploy two battery energy storage system projects in northern Saudi Arabia’s Tabuk and Hail provinces. The total capacity of the projects is 4GWh, utilizing HiTHIUM’s long-duration energy storage battery cells in ∞Power 6.25MWh Desert Eagle Battery Energy Storage System (BESS). This landmark project, developed in partnership with Alfanar Projects, represents one of the largest BESS deployments in the Middle East and will play a pivotal role in advancing Saudi Arabia’s Vision 2030 by enhancing grid stability and renewable energy integration.

    Innovation Meets Extreme Environments

    Leveraging HiTHIUM’s industry-leading ∞Cell 1175Ah technology – the world’s first mass-produced long-duration energy storage solution – the project features ∞Power 6.25MWh Desert Eagle series containerized systems specifically engineered for Saudi Arabia’s harsh climate.

    • Heat Resilience: Multi-layer insulation reduces internal temperatures by 8–10°C, ensuring reliable operation in -30°C to 60°C.
    • Sandstorm Protection: Fully sealed components and automated dust alerts minimize maintenance needs.
    • Proven Durability: Critical components rated for 40,000+ hours of continuous operation.

    Strategic Impact & Local Commitment

    The BESS will provide critical grid services, including load shifting, black-start capabilities, frequency regulation, and voltage support, enabling higher renewable energy penetration and reducing reliance on fossil fuels. As the technology provider, HiTHIUM will oversee system design, supply, installation supervision, and long-term maintenance, while will lead Alfanar Projects leads construction, with commissioning targeted for 2026.

    Dr. Keramat Fakhari, President of MEA at HiTHIUM highlighted: “This landmark 4GWh project marks a pivotal moment—not just for Saudi Arabia, but for HiTHIUM’s commitment to delivering mission-critical energy storage where it matters most. By integrating our industry-leading ∞Cell technology with SEC’s vision and Alfanar’s regional expertise, we’re redefining renewable integration in extreme environments. The deployments in Tabuk and Hail set a new benchmark for gigawatt-scale storage globally, proving HiTHIUM’s role in accelerating the clean energy transition.”

    About HiTHIUM

    Founded in 2019, HiTHIUM is a leading global company in renewable energy technology, committed to delivering energy storage solutions centered on advanced battery and system technologies. With robust research, production, sales, and service capabilities worldwide, HiTHIUM is the only energy storage-focused company to achieve GWh-scale global shipments of lithium-ion ESS batteries. Its customer-centric approach drives cutting-edge products and solutions for customers across more than 20 countries and regions.

    Hithium ∞Power 6.25MWh Desert Eagle Series BESS

    Photo – https://mma.prnewswire.com/media/2758853/Hithium__Power_6_25MWh_Desert_Eagle_Series_BESS.jpg
    Logo – https://mma.prnewswire.com/media/2756901/7c3129fca23bd8070ae415d1d2ae8b46_Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/hithiums-breakthrough-cell-1175ah-powers-landmark-4gwh-long-duration-energy-storage-project-in-saudi-arabia-302539690.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email VKontakte WhatsApp
    Previous ArticleSungrow Tackles Middle East and Africa’s Extreme Heat with Launch of 1+X 2.0 Modular Inverter
    Next Article KONE Egypt and United Elevators Sign Strategic Contract to Expand Market Reach and Customer Offerings

    Related Posts

    Inovance Invests $280M in High-Power Motor Facility, Targeting Net-Zero Heavy Industry

    April 23, 2026

    Getac Redefines Rugged Mobility with Launch of G140 Copilot+ PC, Powered by AMD Technology

    April 23, 2026

    Heidi Launches in South Africa as Clinician-Led Adoption Surges Past 15,000

    April 23, 2026
    Editor's Pick

    Africa moves higher on Austria trade and security agenda

    April 22, 2026

    UAE and Sierra Leone presidents discuss bilateral ties

    April 22, 2026

    Apple names John Ternus CEO as Tim Cook shifts roles

    April 21, 2026

    flydubai adds daily Dubai Bangkok flights from July

    April 21, 2026

    UAE and Albania leaders deepen bilateral ties

    April 21, 2026

    Mercedes-Benz unveils electric C-Class in Seoul

    April 21, 2026

    Sabah fire destroys 1,000 homes and displaces thousands

    April 20, 2026
    © 2026 Giza Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.